1. Topic: Local Council's approval process for a Residential Pr
They are a written consent from a building surveyor that the construction plans have been checked to comply with the building regulations, and hence authorises construction (Mt A, 2002). ... The construction site studied is located in Kooyong, and belongs to the Stonnington City Council. ... Specific inspections for the construction of a residential house must be performed at the footing, slab, frame and the final stages of construction (BCC, 2002). ... The footing inspection was done before the concrete was poured for the strip footing and involved inspecting the foundation material and t...
- Word Count: 1557
- Approx Pages: 6
- Has Bibliography
- Grade Level: Undergraduate